Economics of the H.T.G.C.R. fuel cycle, Part 1 - pre-design cost study of fuel cycle facility

Loading...
Thumbnail Image
Date
1967-05
Journal Title
Journal ISSN
Volume Title
Publisher
Australian Atomic Energy Commission
Abstract
A conceptual design study of a facility to recycle fuel from a beryllium oxide moderated high temperature gas -cooled pebble bed reactor has been made. For a facility to handle 300 kg of fuel per day, the capital cost is estimated as $A30 millions and the annual direct operating cost, excluding capital charges, as $A3-1 millions.
Description
Keywords
Beryllium oxides, Fuel reprocessing plants, Gas cooled reactors, Economic analysis
Citation
May, J. R., & Devine, J. M. (1967). Economics of the H.T.G.C.R. fuel cycle, Part 1 - pre-design cost study of fuel cycle facility. (AAEC/E175). Lucas Heights, N.S.W: Australian Atomic Energy Commission, Research Establishment.