Economics of the H.T.G.C.R. fuel cycle, Part 1 - pre-design cost study of fuel cycle facility
dc.contributor.author | May, JR | en_AU |
dc.contributor.author | Devine, JM | en_AU |
dc.date.accessioned | 2007-11-22T04:20:05Z | en_AU |
dc.date.accessioned | 2010-04-30T04:34:06Z | en_AU |
dc.date.available | 2007-11-22T04:20:05Z | en_AU |
dc.date.available | 2010-04-30T04:34:06Z | en_AU |
dc.date.issued | 1967-05 | en_AU |
dc.description.abstract | A conceptual design study of a facility to recycle fuel from a beryllium oxide moderated high temperature gas -cooled pebble bed reactor has been made. For a facility to handle 300 kg of fuel per day, the capital cost is estimated as $A30 millions and the annual direct operating cost, excluding capital charges, as $A3-1 millions. | en_AU |
dc.identifier.citation | May, J. R., & Devine, J. M. (1967). Economics of the H.T.G.C.R. fuel cycle, Part 1 - pre-design cost study of fuel cycle facility. (AAEC/E175). Lucas Heights, N.S.W: Australian Atomic Energy Commission, Research Establishment. | en_AU |
dc.identifier.govdoc | 434 | en_AU |
dc.identifier.other | AAEC-E-175 | en_AU |
dc.identifier.uri | http://apo.ansto.gov.au/dspace/handle/10238/363 | en_AU |
dc.language.iso | en_au | en_AU |
dc.publisher | Australian Atomic Energy Commission | en_AU |
dc.subject | Beryllium oxides | en_AU |
dc.subject | Fuel reprocessing plants | en_AU |
dc.subject | Gas cooled reactors | en_AU |
dc.subject | Economic analysis | en_AU |
dc.title | Economics of the H.T.G.C.R. fuel cycle, Part 1 - pre-design cost study of fuel cycle facility | en_AU |