| Title: | Economics of the H.T.G.C.R. fuel cycle, Part 1 - pre-design cost study of fuel cycle facility. |
| Authors: | May, JR Devine, JM |
| Issue Date: | May-1967 |
| Publisher: | Australian Nuclear Science and Technology Organisation |
| Abstract: | A conceptual design study of a facility to recycle fuel from a beryllium oxide moderated high temperature gas -cooled pebble bed reactor has been made. For a facility to handle 300 kg of fuel per day, the capital cost is estimated as $A30 millions and the annual direct operating cost, excluding capital charges, as $A3-1 millions. |