Economics of the H.T.G.C.R. fuel cycle, Part 1 - pre-design cost study of fuel cycle facility

Loading...
Thumbnail Image

Journal Title

Journal ISSN

Volume Title

Publisher

Australian Atomic Energy Commission

Abstract

A conceptual design study of a facility to recycle fuel from a beryllium oxide moderated high temperature gas -cooled pebble bed reactor has been made. For a facility to handle 300 kg of fuel per day, the capital cost is estimated as $A30 millions and the annual direct operating cost, excluding capital charges, as $A3-1 millions.

Description

Citation

May, J. R., & Devine, J. M. (1967). Economics of the H.T.G.C.R. fuel cycle, Part 1 - pre-design cost study of fuel cycle facility. (AAEC/E175). Lucas Heights, N.S.W: Australian Atomic Energy Commission, Research Establishment.