Please use this identifier to cite or link to this item: https://apo.ansto.gov.au/dspace/handle/10238/363
Title: Economics of the H.T.G.C.R. fuel cycle, Part 1 - pre-design cost study of fuel cycle facility
Authors: May, JR
Devine, JM
Keywords: Beryllium oxides
Fuel reprocessing plants
Gas cooled reactors
Economic analysis
Issue Date: May-1967
Publisher: Australian Atomic Energy Commission
Citation: May, J. R., & Devine, J. M. (1967). Economics of the H.T.G.C.R. fuel cycle, Part 1 - pre-design cost study of fuel cycle facility. (AAEC/E175). Lucas Heights, N.S.W: Australian Atomic Energy Commission, Research Establishment.
Abstract: A conceptual design study of a facility to recycle fuel from a beryllium oxide moderated high temperature gas -cooled pebble bed reactor has been made. For a facility to handle 300 kg of fuel per day, the capital cost is estimated as $A30 millions and the annual direct operating cost, excluding capital charges, as $A3-1 millions.
Gov't Doc #: 434
URI: http://apo.ansto.gov.au/dspace/handle/10238/363
Appears in Collections:Scientific and Technical Reports

Files in This Item:
File Description SizeFormat 
AAEC-E-175.pdf1.18 MBAdobe PDFThumbnail
View/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.