Interim report task 3: immobilisation process/equipment testing – task 3.4: nondestructive evaluation Part 1 of 2 to Lawrence Livermore National Laboratory for contract B345772
Loading...
Files
Date
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
US Department of Energy (DOE)
Abstract
This report contains a summary of the results generated for Task 3.4: Non-destructive Evaluation (a subtask of Task 3: Immobilization Process/Equipment Testing). The aim of this task was to carry out X-ray diffraction (XRD) on selected samples from previous Task 1: Form Development work. These XRD results were to be compared to the results obtained using quantitative scanning electron microscopy.
Description
Citation
Stewart, M. W. A., Vance, E. R., Day, R. A., & Lumpkin, G. R. (2000). Interim report task 3: immobilisation process/equipment testing - task 3.4: nondestructive evaluation Part 1 of 2 to Lawrence Livermore National Laboratory under contract B345772 (No. UCRL-CR-139071-PT-1). Lawrence Livermore National Lab.(LLNL), Livermore, CA (United States). doi:10.2172/15007284