COGEMA-ANSTO management of the acceptance process of HIFAR spent fuel

Loading...
Thumbnail Image
Date
2002-03-24
Journal Title
Journal ISSN
Volume Title
Publisher
International Group On Research Reactors
Abstract
The Australian Nuclear Science and Technology Organisation (ANSTO) has operated the 10 MW DIDO class High Flux Materials Test Reactor (HIFAR) since 1958. Refuelling the reactor produces about 38 spent fuel elements each year. In 1999, ANSTO signed a contract with COGEMA for the management of all non-US origin spent fuel, and two shipments to La Hague have been completed to date. Prior to a fuel shipment, ANSTO provides COGEMA with the spent fuel characteristics. Together with ANSTO, COGEMA has developed criteria for acceptance of HIFAR spent fuel at La Hague. These include visual inspections, testing of fuel that may be unsound, and a final check of a gas sample drawn from a filled transport cask. © 2003 The Authors
Description
Keywords
ANSTO, AREVA NC La Hague, HIFAR Reactor, Spent fuel casks, Spent fuel elements, Waste transportation
Citation
Thomasson, J., & Irwin, T. (2003). COGEMA-ANSTO management of the acceptance process of HIFAR spent fuel. Paper presented to IGORR 9 (9th Meeting of the International Group of Research Reactors), Sydney, Australia, 24-28 March 2003. Retrieved from: https://www.igorr.com/Documents/2003-SYDNEY/THOMASSON.pdf