HIFAR major shutdown report : inspection of reactor aluminum tank and replacement of secondary cooling circuit pipework

dc.contributor.authorKim, Sen_AU
dc.date.accessioned2022-09-23T01:10:30Zen_AU
dc.date.available2022-09-23T01:10:30Zen_AU
dc.date.issued1996-11-04en_AU
dc.date.statistics2022-07-22en_AU
dc.description.abstractHIFAR (High Flux Australian Reactor) is a 100MW DIDO-class research reactor operated by the Australian Nuclear Science and Technology Organisation (ANSTO). Every four years HIFAR has a scheduled major shutdown to undertake inspection, maintenance and upgrade activities that are not possible at other times. The last major shutdown was in late 1995 and lasted 10 weeks during which, and amongst other activities, the Reactor Aluminium Tank was inspected and the major part of the Secondary Cooling Water Circuit pipework replaced. New cooling pipework was designed in accordance with Australian Standards Pressure Piping Code, employing NISA II computer software for finite element analysis where appropriate, with a view to ensuring safety under every conceivable operating and accident condition. Design, manufacture and installation activities were carried out according to ANSTO Engineering's Quality System Procedures (1S09OO1-1994 accredited) and agreed by the Nuclear Safety Bureau, an independent organisation. through staged document submissions.en_AU
dc.identifier.citationKim, S. (1996). HIFAR major shutdown report : inspection of reactor aluminum tank and replacement of secondary cooling circuit pipework. Paper presented to the International Group on Research Reactors (IGORR 5), Aix-En-Provence, France, November 4-6, 1996. Retrieved from: https://www.igorr.com/Documents/1996-AIX-EN-PROVENCE/IGORR-1996.pdfen_AU
dc.identifier.conferenceenddate6 November 1996en_AU
dc.identifier.conferencenameInternational Group on Research Reactors (IGORR 5)en_AU
dc.identifier.conferenceplaceAix-En-Provence, Franceen_AU
dc.identifier.conferencestartdate4 November 1996en_AU
dc.identifier.urihttps://www.igorr.com/Documents/1996-AIX-EN-PROVENCE/IGORR-1996.pdfen_AU
dc.identifier.urihttps://apo.ansto.gov.au/dspace/handle/10238/13837en_AU
dc.language.isoenen_AU
dc.publisherTechnicatomeen_AU
dc.subjectHIFAR Reactoren_AU
dc.subjectANSTOen_AU
dc.subjectAustraliaen_AU
dc.subjectReactor shutdownen_AU
dc.subjectReactor maintenanceen_AU
dc.subjectInspectionen_AU
dc.subjectPipesen_AU
dc.subjectStandardsen_AU
dc.titleHIFAR major shutdown report : inspection of reactor aluminum tank and replacement of secondary cooling circuit pipeworken_AU
dc.typeConference Paperen_AU
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
IGORR-1996.pdf
Size:
19.87 MB
Format:
Adobe Portable Document Format
Description:
License bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.63 KB
Format:
Item-specific license agreed upon to submission
Description: