Please use this identifier to cite or link to this item:
https://apo.ansto.gov.au/dspace/handle/10238/679
Title: | Commissioning and final installation report for the STAR Accelerator Facility |
Authors: | Garton, D |
Keywords: | Mass spectrometers Accelerators Commissioning Installation |
Issue Date: | Sep-2005 |
Publisher: | Australian Nuclear Science and Technology Organisation |
Citation: | Garton, D. (2005). Commissioning and final installation report for the star accelerator facility (ANSTO-E-758). Lucas Heights, NSW: Australian Nuclear Science and Technology Organisation. |
Abstract: | This document describes the commissioning phases, management, safety and approvals systems used during the installation of the STAR Accelerator Facility. It is also intended as a historical account of changes to the engineering specification and the necessary modifications that were made to meet local and national standards. |
Gov't Doc #: | 689 |
URI: | http://apo.ansto.gov.au/dspace/handle/10238/679 |
ISSN: | 1030-7745 |
Appears in Collections: | Scientific and Technical Reports |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
ANSTO-E-758.pdf | 398.11 kB | Adobe PDF | ![]() View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.