Please use this identifier to cite or link to this item: https://apo.ansto.gov.au/dspace/handle/10238/363
Full metadata record
DC FieldValueLanguage
dc.contributor.authorMay, JRen_AU
dc.contributor.authorDevine, JMen_AU
dc.date.accessioned2007-11-22T04:20:05Zen_AU
dc.date.accessioned2010-04-30T04:34:06Z-
dc.date.available2007-11-22T04:20:05Zen_AU
dc.date.available2010-04-30T04:34:06Z-
dc.date.issued1967-05en_AU
dc.identifier.citationMay, J. R., & Devine, J. M. (1967). Economics of the H.T.G.C.R. fuel cycle, Part 1 - pre-design cost study of fuel cycle facility. (AAEC/E175). Lucas Heights, N.S.W: Australian Atomic Energy Commission, Research Establishment.-
dc.identifier.govdoc434-
dc.identifier.otherAAEC-E-175en_AU
dc.identifier.urihttp://apo.ansto.gov.au/dspace/handle/10238/363en_AU
dc.description.abstractA conceptual design study of a facility to recycle fuel from a beryllium oxide moderated high temperature gas -cooled pebble bed reactor has been made. For a facility to handle 300 kg of fuel per day, the capital cost is estimated as $A30 millions and the annual direct operating cost, excluding capital charges, as $A3-1 millions.en_AU
dc.language.isoen_auen_AU
dc.publisherAustralian Atomic Energy Commissionen_AU
dc.subjectBeryllium oxides-
dc.subjectFuel reprocessing plants-
dc.subjectGas cooled reactors-
dc.subjectEconomic analysis-
dc.titleEconomics of the H.T.G.C.R. fuel cycle, Part 1 - pre-design cost study of fuel cycle facilityen_AU
Appears in Collections:Scientific and Technical Reports

Files in This Item:
File Description SizeFormat 
AAEC-E-175.pdf1.18 MBAdobe PDFThumbnail
View/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.